Development Guidelines

A community developed with care since day one.

Since day one, Innsbrook has always been a totally planned corporate environment, with protective land use and architectural covenants implemented to create, maintain, control and preserve this mixed-use community.

The Innsbrook Protective Covenants ensure that:

  • The community will be developed, improved and used in such a manner that promotes a harmonious, appealing appearance and function
  • Land uses will be compatible and complementary, and
  • Owners of land will be protected against any use of other land located in Innsbrook which might unreasonably depreciate or detract from the value and use of their land.

Download the Protective Covenants

Download the Covenant Resolutions

Download Recorded First Amendment

Download Recorded Second Amendment

Download Funding Mechanism Letter for Endowment and Capital Funds

Download Urban sidewalk amendment #1

For more information, contact the Innsbrook Owners Association or call (804) 747-7800.


ARC Planning and Zoning

Before beginning construction or alteration on any Innsbrook property, owners must first submit plans and specifications to the Architectural Review Committee for written approval. Plan submittals are required for construction or alteration of any buildings, enclosures and fences, loading docks, parking facilities, storage yards, storage tanks, landscaping or any other structures or permanent improvements on or to any Innsbrook site.

Download Innsbrook Landscape Design Guidelines

Plans and specifications must show plot layout and all exterior elevations, noting materials, colors, structural design, signs and landscaping.
Approval is based on the adequacy of site dimensions, storm drainage considerations, conformity and harmony of external design with neighboring structures, improvements, operations and uses, relation of topography, grade and finished ground elevation of the site being improved to that of neighboring sites and proper facing of main elevation with respect to nearby streets.

Download a detailed overview of the design review process.

Innsbrook Urban Mixed-Use District, Urban Design Guidelines

Download property signage standards


Storm Water Management

Redevelopment of Innsbrook to a vibrant, mixed-use community for the benefit of all stakeholders is predicated on three integral components: (1) Urban Mixed-Use (“UMU”) designation on the Henrico County Comprehensive Plan, (2) Urban Development Area (“UDA”) designation by the Board of Supervisors and (3) acceptance by Henrico County of the Innsbrook Comprehensive Stormwater Plan that incorporates the first two elements and allows them to be achieved. Close coordination is essential to making these advanced planning objectives a reality.

Concern for the long term rights of all Innsbrook property owners to the lake system as a communal BMP caused the IOA to commission an Innsbrook Comprehensive Stormwater Management Plan. This plan was submitted to Henrico County and accepted by them. The result was to grandfather the development rights of all Innsbrook property owners and to prevent those outside Innsbrook but still in the drainage basin from utilizing our lake system for their own development plans. The Executive Summary from this report is outlined below.

In order to ensure the rights of each Innsbrook property owner to use their allocated share of the lake system as a BMP for future development, a master worksheet has been created showing the impervious surface area for each property owner as a percentage of their total land area and their allocated percentage under the Stormwater Management Plan. If a property owner wishes to change the impervious surface area on their property, whether as a result of new development or otherwise, engineered plans are to be submitted to the ARC showing the current ratio of impervious surface area and the proposed level of impervious surface area. In all instances, such plans will only be approved if the proposed ratio is equal to or less than the allocated ratio.

In this manner, the ARC is able to ensure that all property owners are treated equally and their property rights are preserved over time. To the extent a property owner is willing to sell a portion of their rights to the lake BMP, such transfer will be noted on the worksheet as a permanent transfer along with a suitable recorded document to that effect. To determine the extent of your rights under the Stormwater Management Plan, please contact Brian Menditto (804-747-7800) for additional details.

Click Here For Comprehensive Stromwater management Report PDF

Stormwater Quality

Stormwater Quantity


Innsbrook Architectural Review Committee

The development rights existing at Innsbrook will be allocated to all property owners at Innsbrook through the Architectural Review Committee (“ARC”).  The ARC will track the development density and impervious surface area as part of its normal approval process in order to assure equitable allocation among all property owners.

Off-Site Redevelopment

Any redevelopment within the Innsbrook drainage area but not subject to the covenants of the Innsbrook Owners Association will have no right to use the Innsbrook lake system or other stormwater control measures to satisfy any redevelopment requirements, or additional requirements that may emanate from the proposed stormwater regulations.  Any and all such redevelopment will be required to meet DCR and Henrico stormwater criteria as a stand-alone project.

Stormwater Regulations:

The following stormwater regulations and guidelines were followed in the analysis and shall apply to the Innsbrook Redevelopment:

  • Henrico County Erosion and Sediment Control (ESC) Program (Chapter 10, Article II of the County Code), required by Erosion and Sediment Control Law (Section 10.1-560 et seq.  of the State Code), and compliance with the minimum standards of the Erosion and Sediment Control Regulations (VR 625-02-00); Virginia Erosion and Sediment Control Handbook (VESCH, 3rd Edition, 1992)
  • The Chesapeake Bay Preservation Act (Section 10.1-2100 et seq.  of the State Code) and the Chesapeake Bay Preservation Area Designation and Management Regulations (9VAC10-20 et seq.)
  • The Virginia Sormwater Management Law (Section 10.1-603 et seq.  of the State Code) and the Virginia Stormwater Management Regulations (4VAC3-20 et seq.)
  • The National Pollutant Discharge Elimination System (NPDES) and Virginia Pollutant Discharge Elimination System (VPDES) developed under the authority of Section 402(p) of the Clean Water Act.

 

For more information on development at Innsbrook click here.

Download Our Most Recent Annual Report

Download Now